OVERVIEW

RWE recognized that the correct choice of material with the capability to grout at low temperatures was an important attribute, as the bad weather capability went hand in hand with the improved significant wave height capability of their installation vessel. The possibility to grout at temperatures as low as 0°C with our MasterFlow 9500, made the choice of the grouting product easy. Serious cost control or even cost reduction was achieved for the effective time that the installation vessels were operating in the offshore conditions.

No featured products in this case study

Contact Master Builders Solutions UK Ltd by clicking the button below to find out which products were used in this case study.