NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

Wimbledon Chase Primary School

OVERVIEW

The facilities were in need of a complete overhaul. Accredited Installers, G Haslehurst Builders, were appointed to reconfigure the space which included the installation of contemporary, reliable and easy to maintain washroom systems.


Versatile and robust Award toilet cubicles were specified due to the unrivalled safety features that come as standard. Anti-tamper fixings and emergency release indicator bolts make Award a popular choice for schools. 


The washroom also featured pre-plumbed, factory tested SanCeram Chartham WCs pre-plumbed to SGL Vepps panels and hardwearing SGL vanity units with SanCeram semi-recessed basins and self-closing mixer taps.


Read the full case study for more details.

Products featured in this case study

View all products (59)
Vanities | SGL Vanities

Vanities | SGL Vanities

Vanities | Solid Surface H2 Profile, Factory Plumbed

Vanities | Solid Surface H2 Profile, Factory Plumbed

V1 | Award - Toilet Cubicle

V1 | Award - Toilet Cubicle

More case studies from Venesta Washroom Systems Ltd

View all case studies (33)
Education | Magdalen College School

Education | Magdalen College School

Education | Royal Grammar School

Education | Royal Grammar School

Education | Isaac Newton Academy

Education | Isaac Newton Academy

Education | Belleville Primary School

Education | Belleville Primary School

More case studies from Panel cubicle systems

View all case studies (37)
Concierge Camping

Concierge Camping

Honiton Swimming Pool

Honiton Swimming Pool

Ysgol Y Bynea

Ysgol Y Bynea

Ysgol Saron

Ysgol Saron

More case studies from Vanity units

View all case studies (14)
Cherry Pips Day Nursery

Cherry Pips Day Nursery

Helensburgh Leisure Centre Project

Helensburgh Leisure Centre Project

St Sidwells Point Leisure Centre Project

St Sidwells Point Leisure Centre Project

The Pyramids Centre Leisure Complex Project

The Pyramids Centre Leisure Complex Project