In 2014 discussions took place between IKO and Architect for the property, over the possibility of renewing the mastic asphalt roof coverings with an IKO Permaphalt Polymer Modified Mastic Asphalt System. During 2015 this process took place with the work being undertaken by Knight Asphalte, one of IKO’s Approved Contractors. During the works some 35 tonne of IKO Permaphalt was installed and due to IKO’s commitment of supplying Carbon Neutral Mastic Asphalt we are able to calculate the impact th…