This site uses cookies to store information on your computer. Learn more about these cookies, and how to opt out of them. Find out more
OVERVIEW
These two roof complexes form a large and prestigious part of Westfield’s new shopping centre on the edge of the 2012 Olympic Park. Both areas were weathered with an inverted Mastic Asphalt system with a wide range of finishes including both green & brown roof coverings. The material was delivered directly to site in thermostatically controlled hot charge vehicles. The asphalt was lifted to roof level in luggars by our cranes, before being applied by BriggsAmasco directly employed labour.
FlexiPhalte
Briggs Amasco smooth surface at King's Cross platform redevelopment
Aberdeen Airport
Gateshead Bus Station
Anderson Building