NBS Source
I'm a manufacturer

This case study is no longer available.

Water Industry Solutions - Hogsmill Sewage Treatment Works

OVERVIEW

This project involved the encapsulation of two primary settlement tanks within “bio domes” in order to reduce odours in the surrounding residential area and harvest the methane produced. MasterEmaco N 5200 rapid-setting mortar was used on this project enabling the re-profiled surface to be sufficiently cured within 7 days to receive the coating. Rapid installation and return to service of the applied coating thanks to the combination of MasterTop P660 primer and MasterSeal M 689 coating.

No featured products in this case study

Contact Master Builders Solutions UK Ltd by clicking the button below to find out which products were used in this case study.