OVERVIEW

When a major blaze swept through the sports pavilion at Verulam School in St. Albans, only one thing was left standing in the changing rooms ? the Boyco fittings. Even after the roof had fallen in and flames had gutted the changing block, the Boyco benches and peg rails were still firmly in place. The suspected arson attack at the Sandy Pit Lane site caused extensive damage and the entire pavilion needed rebuilding. As a fire fighter at the scene explained "The pavilion was made of wood and concrete with a tar and bitumen roof so it was pretty flammable".

Products featured in this case study

View all products (44)
Single Island Bench Unit With Peg Rail (SSA Series)

Single Island Bench Unit With Peg Rail (SSA Series)

Bag Tray Bench Unit With Peg Rail and Optional Shelf Over (WAT Series)

Bag Tray Bench Unit With Peg Rail and Optional Shelf Over (WAT Series)

Island Bag Tray Bench Unit With Peg Rail (AT Series)

Island Bag Tray Bench Unit With Peg Rail (AT Series)

WB Peg Rail - Coat clothes hook rail/ peg rail.

WB Peg Rail - Coat clothes hook rail/ peg rail.

Wall And Floor Fixed Cloak Room Benching With Shoe Shelf And Peg Rail (WA Series)

Wall And Floor Fixed Cloak Room Benching With Shoe Shelf And Peg Rail (WA Series)

Wall And Floor Fixed Cloak Room Benching With Shoe Shelf, Peg Rail And Shelf Over (WAS1 Series)

Wall And Floor Fixed Cloak Room Benching With Shoe Shelf, Peg Rail And Shelf Over (WAS1 Series)

Wellington Wall Mounted Seat

Wellington Wall Mounted Seat

Freestanding Bench With Independent Peg Rail (WA/FS Series)

Freestanding Bench With Independent Peg Rail (WA/FS Series)

More case studies from Boyco (UK) Ltd

View all case studies (14)
Investment bank project, Lockers

Investment bank project, Lockers

Hillside School

Hillside School

Cheadle Hulme Sports Pavilion

Cheadle Hulme Sports Pavilion

Ysgol Bro Alun, Gwersyllt

Ysgol Bro Alun, Gwersyllt

More case studies from Linked seats

View all case studies (11)
Cheadle Hulme Sports Pavilion

Cheadle Hulme Sports Pavilion

Ysgol Bro Alun, Gwersyllt

Ysgol Bro Alun, Gwersyllt

Barrow Hall Primary School

Barrow Hall Primary School

Honiton Swimming Pool

Honiton Swimming Pool

More case studies from Clothes rails

View all case studies (7)
Cheadle Hulme Sports Pavilion

Cheadle Hulme Sports Pavilion

Ysgol Bro Alun, Gwersyllt

Ysgol Bro Alun, Gwersyllt

Barrow Hall Primary School

Barrow Hall Primary School

Verulam School

Verulam School