OVERVIEW

The local council was tasked with constructing a footpath within a restricted area allowing safer access to a busy health centre. It was important to maintain the natural green appearance. A retaining wall was required and had to be quick and easy to erect with minimal disruption. ABG Webwall was chosen as the solution. The Webwall was quickly constructed using 4m x 1m panels which were filled with soil from the excavation and cutting. The wall was replanted to restore an naturally green appearance. Webwall was built in a quick cost effective way to create an environmentally friendly retaining wall

No featured products in this case study

Contact ABG by clicking the button below to find out which products were used in this case study.

More case studies from ABG

View all case studies (31)
Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK

Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK

Erosion Control, Flood Embankment, Erosamat, Greatham, Hartlepool

Erosion Control, Flood Embankment, Erosamat, Greatham, Hartlepool

Stabilisation - Abweb and Abgrid, Quarry Bank Mill, Styal, Cheshire, UK

Stabilisation - Abweb and Abgrid, Quarry Bank Mill, Styal, Cheshire, UK

SuDS Pond - Groundwater Control, Pozidrain, Newcastle Airport, UK

SuDS Pond - Groundwater Control, Pozidrain, Newcastle Airport, UK