NBS Source
I'm a manufacturer

This case study is no longer available.

Upper Dolfor Road

OVERVIEW

A self-build, six-bedroom, detached property, in Powys. Using aircrete, a certified MMC, main contractor B.W Bellis was able to complete the block-work within six weeks. Apart from some technical assistance from H+H on working with aircrete, all of the block work was laid by a single worker during this time. The main contractor had used H+H Celcon Blocks when building his own home and was impressed with the thermal performance so recommended the use of aircrete to the client. Products used: Celcon 140mm Jumbo Bloks on the inner leaf cavity walls of the property.

No featured products in this case study

Contact H+H UK Ltd by clicking the button below to find out which products were used in this case study.

More case studies from H+H UK Ltd

View all case studies (5)
I-House using Celcon Vertical Wall Panels

I-House using Celcon Vertical Wall Panels

Stanpit I-House, Karm Homes

Stanpit I-House, Karm Homes

Bottle Lane Self-Build Project

Bottle Lane Self-Build Project

Oyster Reach, Whitstable, Kent

Oyster Reach, Whitstable, Kent