The University of Winchester programmed the upgrade of 63 student en-suite showers and toilet facilities for their halls of residence through the 2014 summer vacation period over an eight-week program. The walls were covered with tiling. The grout was difficult to clean and the tiles were showing signs of age which required regular repair. It was decided to renew areas with materials that would give long life, reduce maintenance costs and above all make it much easier for the cleaning teams to …