This case study is no longer available
As part of the Manchester to Preston Electrification program, the two Victorian-built Farnworth rail tunnels (Up & Down) were refurbished. BASF’s concrete admixtures and SA 160 accelerator provided a workable concrete that performed both technically and reliably within the possession timeframes. Producing a consistent reinforced wet spray concrete that could be pumped up to 300 meters and remain suitable to spray.
Contact Master Builders Solutions UK Ltd by clicking the button below to find out which products were used in this case study.