NBS Source
I'm a manufacturer

Twyford HQ Taken to the Next Level with Gartec

OVERVIEW

The high traffic HQ for Interserve required a lift in an awkward stairwell space, to match the contemporary style of the building. A Gartec 7000 passenger platform lift was installed in just 3 days with no building works, with a fully glass shaft. Gartec worked around the glass stairwell, removing panels where required. The small footprint, low cost and simple maintenance made the lift ideal for the location. Sheena, the Office Manager, commented "the install team worked quickly and efficiently... now completed it looks like it has always been there".

No featured products in this case study

Contact Gartec Platform Lifts by clicking the button below to find out which products were used in this case study.

More case studies from Gartec Platform Lifts

View all case studies (12)
H&M Boost Mezzanine Access with Gartec Lift

H&M Boost Mezzanine Access with Gartec Lift

Godalming Home Gets Smart with Gartec Home Lift

Godalming Home Gets Smart with Gartec Home Lift

Motorline Renault Plan Showroom Access with Gartec Lifts

Motorline Renault Plan Showroom Access with Gartec Lifts

Matalan Reduce Manual Handling with Gartec Lift

Matalan Reduce Manual Handling with Gartec Lift