NBS Source
I'm a manufacturer

This case study is no longer available.

Tunnel beneath the Mersey

OVERVIEW

The Kingsway Tunnel between Liverpool and Wallasey was in need of repair. The existing concrete road surface had become worn and smooth, meaning vehicle incidents during rush hour had become a frequent event. This was not a simple resurfacing job due to height restrictions in the tunnel and the time of day the work was permitted to be carried out. Our contracting team worked closely with the client, Merseytravel, to propose an effective plan of action for delivering this project safely and efficiently, relying on the unique benefits of its fleet of non-tipping trucks (NTTs).

No featured products in this case study

Contact Aggregate Industries - Asphalt by clicking the button below to find out which products were used in this case study.