The White Collar Factory will be a mixed-use are of workspace, residential and retail, designed by architects, AHMM. The development, sited on London's City Road, comprises a new 16-storey office tower, a new public square and refurbished existing buildings to the rear. The new 2-storey basement has been waterproofed using a Type C system applied internally, to provide drained protection in accordance with BS 8102: 2009. The waterproofing was supplied by Triton Systems.
Contact Triton Systems by clicking the button below to find out which products were used in this case study.
Ground Gas Barrier for Almshouses
Watertight Concrete Basement For Luxury Wembley Development
Wine Cellar Made Watertight By Triton
Triton Systems Specified For Underground Car Park Upgrade