NBS Source
I'm a manufacturer

This case study is no longer available.

Transport For London

OVERVIEW

The scheme included removing a car lane and making it a wide pavement with a rain garden in the centre. Even the paving on the pavement includes a special compound to absorb harmful particles from the air. Trees and grass was added in the rain garden to further improve things and ANS Living Walls have been installed along the face of ‘The Mall’ shopping centre on the other side of the road. The road itself has had speed ramps added and a bus stop.

No featured products in this case study

Contact Viritopia Limited by clicking the button below to find out which products were used in this case study.

More case studies from Viritopia Limited

View all case studies (1)
Edgbaston Stadium

Edgbaston Stadium