NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

The Warwick School Makeover Project

OVERVIEW

The Warwick School is undergoing a major transformation. It has a brand new school building, and as of September 2021, it will have a brand new logo, uniform and name, Carrington School. Kerry, the headteacher, talks about the old buildings in Surrey Live, “they were dilapidated. They were dark, small, in some places the heating didn’t work properly. They had just run out of steam, and over the years of thousands of students going through them, they needed some care and attention.” The new teaching block is made up of 22 classrooms, a dining space, a social area for students to relax in and a sports hall. This makeover and expansion have helped the school to increase its GCSE range.


The new name derives from Richard Carrington, an astronomer who built Redhill Observatory in 1852. It was there that he carried out pioneering investigations on solar flares and devised a system for numbering complete rotations of the sun, still in use today. Some of the secondary school students live in Redhill streets which carry his name.

Helmsman is extremely happy to have manufactured, supplied and installed laminate school lockers. These are in the new building over two floors. The four-compartment lockers have provided storage for 157 students. These laminate school lockers have sloping tops and end panels to keep the lockers secure from vandalism and to keep them clean. During the install, these lockers were bolted together side by side and to the walls for safety purposes. We used Abet Laminati for the doors. The school chose beautiful colours of aubergine, tones of grey and others colours to make these lockers stand out and to match the modern feel around the building.


Installation of standard school lockers of 1775 height by 300 widths and 450 depths with the standard swivel locks decorate the new building. Swivel locks have two functions: Locking with a padlock, and it can also be used as a handle to open/close the locker. Each compartment has an oval laminated number plate. These lockers will provide long-lasting durability for the transformed secondary school.


Helmsman is the leading manufacturer of a complete range of lockers and cubicles in the UK and a specialist in providing solutions across different sectors from leisure, healthcare and education through to commercial, retail, construction and industrial. With a dedicated and experienced in-house design team supported by its on-site factory, the company produces high-quality lockers manufactured for each project.

Products featured in this case study

View all products (23)
Laminate Lockers - Dry Area

Laminate Lockers - Dry Area

Laminate Lockers - Wet Area

Laminate Lockers - Wet Area

More case studies from Helmsman

View all case studies (69)
Suffolk Golf Club

Suffolk Golf Club

University of Strathclyde Health & Wellbeing Centre

University of Strathclyde Health & Wellbeing Centre

Kendal Leisure Centre

Kendal Leisure Centre

Isenhurst Health Club

Isenhurst Health Club

More case studies from Lockers

View all case studies (35)
Investment bank project, Lockers

Investment bank project, Lockers

Laminate Lockers & Z Lockers at 72 Welbeck Street, London

Laminate Lockers & Z Lockers at 72 Welbeck Street, London

Heated Lockers at the Innovation Hub, Production Park

Heated Lockers at the Innovation Hub, Production Park

Ipswich Town Football Club Project

Ipswich Town Football Club Project