NBS Source
I'm a manufacturer

This case study is no longer available.

The Signal, 91 Newington Causeway

OVERVIEW

The Signal rises 22 storeys over one of the most exciting residential redevelopment areas in central south London. The Outsulation external wall insulation (EWI) system was specified incorporating 50mm expanded polystyrene insulation and is finished with a bespoke Dryvit speciality TerraNeo finish. The Signal will act as a catalyst for the total transformation of Newington Causeway. It is at the start of an array of hugely important landmark developments along this stretch. The façade of the building consists of sheathed lightweight steel frame clad with 3,600m2 of Dryvit Outsulation external wall insulation system (EWI).

No featured products in this case study

Contact Dryvit – a brand of Tremco CPG UK Ltd by clicking the button below to find out which products were used in this case study.