NBS Source
I'm a manufacturer

The Shard

OVERVIEW

As Western Europe's tallest building, The Shard needs little introduction.


Its silhouette and design make it immediately recognisable and a transformer of the London skyline. A vertical city is contained within its 310m height, including offices, world-renowned restaurants, high-class residential apartments, a 5-star hotel, and all-around views from London's highest viewing gallery.


Fixfast fasteners were included in several contracts in this massive project, from the heart of the structure to the aesthetic details.


"Always friendly, helpful, and delivery is fast!"

Kevin Harnett - Project Manager at Structural Metal Decks

Products featured in this case study

View all products (100)
DrillFast® Stainless DF3-SS Drilling Fasteners

DrillFast® Stainless DF3-SS Drilling Fasteners

DrillFast® A2/304 Stainless DF6-SS Drilling Fasteners

DrillFast® A2/304 Stainless DF6-SS Drilling Fasteners

DrillFast® A2/304 Stainless DF12-SS Heavy Steel Fasteners

DrillFast® A2/304 Stainless DF12-SS Heavy Steel Fasteners

More case studies from Fixfast Ltd

View all case studies (35)
Ocado Distribution Centre

Ocado Distribution Centre

Morrisons - Sheppey

Morrisons - Sheppey

Exeter College Cohen Quad

Exeter College Cohen Quad

Curious Brewery

Curious Brewery

More case studies from Self-drilling screws

View all case studies (21)
Ocado Distribution Centre

Ocado Distribution Centre

Morrisons - Sheppey

Morrisons - Sheppey

Curious Brewery

Curious Brewery

Wembley London Designer Outlet

Wembley London Designer Outlet