NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

The Shard

OVERVIEW

As Western Europe's tallest building, The Shard needs little introduction. Fixfast helped several contracts in this massive projects, for the heart of the structure to the aesthetic details.

Products featured in this case study

View all products (100)
DrillFast® Stainless DF3-SS Drilling Fasteners

DrillFast® Stainless DF3-SS Drilling Fasteners

DrillFast® A2/304 Stainless DF6-SS Drilling Fasteners

DrillFast® A2/304 Stainless DF6-SS Drilling Fasteners

DrillFast® A2/304 Stainless DF12-SS Heavy Steel Fasteners

DrillFast® A2/304 Stainless DF12-SS Heavy Steel Fasteners

More case studies from Fixfast Ltd

View all case studies (35)
Ocado Distribution Centre

Ocado Distribution Centre

Morrisons - Sheppey

Morrisons - Sheppey

Exeter College Cohen Quad

Exeter College Cohen Quad

Curious Brewery

Curious Brewery

More case studies from Self-drilling screws

View all case studies (21)
Ocado Distribution Centre

Ocado Distribution Centre

Morrisons - Sheppey

Morrisons - Sheppey

Curious Brewery

Curious Brewery

Wembley London Designer Outlet

Wembley London Designer Outlet