NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

The Post Building: Heradesign specified in iconic 1960s site

OVERVIEW

Complementing the exposed services and industrial design aesthetic, whilst fulfilling modern acoustic requirements was a challenge. Heradesign with its acoustic credentials and raw wood wool texture ticked all the boxes. Specified in Grey, Heradesign was installed throughout the main reception area, office spaces and the lift lobbies, providing a strong visual contrast to the exposed structural elements. Architects Allford Hall Monaghan Morris, “The conversion retained the original irregular structural gridlines of the building, so we had to create a consistent pattern across the ceiling- but Heradesign is a really versatile material that worked exceptionally well in the space.”

No featured products in this case study

Contact Knauf Ceiling Solutions Limited by clicking the button below to find out which products were used in this case study.

More case studies from Knauf Ceiling Solutions Limited

View all case studies (16)
£22M Expansion at Leeds Arts University Completed With Knauf Ceiling Solutions

£22M Expansion at Leeds Arts University Completed With Knauf Ceiling Solutions

Top Architecture University Utilises HERADESIGN® in New Studios

Top Architecture University Utilises HERADESIGN® in New Studios

Guy Nelson Hall

Guy Nelson Hall

Knauf Ceiling Solutions Touches Down at Bristol Airport

Knauf Ceiling Solutions Touches Down at Bristol Airport