NBS Source
List your products

The Hydro: Infill panels for the balustrade were supplied by Lang+Fulton, made from Micro-34 architectural grating.

by Lang+Fulton

  Favourite

The SSE Hydro is the biggest performance arena ever designed by Foster+Partners. One of the main points of access to the venue is across an elevated walkway. Infill panels for the balustrade were supplied by Lang+Fulton, made from Micro-34 architectural grating; the galvanized finish and rectilinear appearance complimenting the surrounding buildings. Continuity throughout the overall project was achieved with a Roma-3 grating fence and entrance gates to secure the northern perimeter of the site. In addition, a series of Roma-3 compounds were designed for the secure storage of Events Catering deliveries.

Read more

No featured products in this case study

Contact Lang+Fulton by clicking the button below to find out which products were used in this case study.

More case studies from Lang+Fulton

View all case studies from Lang+Fulton (23)