NBS Source
I'm a manufacturer

This case study is no longer available.

Temporary Power Overlays For Commercial Firm

OVERVIEW

When growing concerns of a buildings electrical services in the City of London came to light, problems such as water ingress and corrosion were some of the challenges to name a few. IDE worked closely to design, manufacture and deliverer a temporary overlay for the outside of the building. To find out more about this solution, click on the case study attached.

No featured products in this case study

Contact IDE Systems by clicking the button below to find out which products were used in this case study.