Sustainable community development made possible with Kinley
OVERVIEW
Extensive edging was required for the courtyards to delineate hard and soft landscapes. During a site visit, BAM asked us to also supply planters, benches, tiles and accessories for the terraces. This required a full supply and install package.
Two 80m walkways were lined with 1.2 x 0.6m Atria tiles. One walkway was built on top of extensive M&E pipework so a bespoke steel pipe cover system was needed to support the tiles.
Atria beige tiles were also used on four of the terraces to surround CorTen steel Planterline bespoke planters with inset iroko timber seating.