Structural Waterproofing and gas proofing using membranes (twin solutions)

by Delta Membrane Systems Ltd

  Favourite

The design concept of this project focuses on the demolition of an existing building and replacing it with a new build mixed use development of 6 storeys (plus basement) 9 self-contained units on floors 1-5 and 377sq m of commercial space on the basement and ground floors. During the Phase 1 Primary Risk Assessment, borehole and trial pits revealed Dibenzo (a,h)anthracene, CO², TPH and Asbestos contamination. The proposed remedial strategy to be adopted at the site was one of managing the pathway between the source of contamination and the critical receptors on-site.

Read more

No featured products in this case study

Contact Delta Membrane Systems Ltd by clicking the button below to find out which products were used in this case study.