Structural Drainage - Reservoir Base Uplift, Deckdrain, Rushmore STW, Telford, UK

by ABG creative geosynthetic engineering

  Favourite

Part of Severn Trent Waters e5 Major Projects Programme, Rushmore STW is a strategic centre for sludge digestion, de-watering and cake storage. Due to expected growth in the local population the PSTs would need refurbishment. A high water table below ground meant stability is constantly changing meaning tanks suffer uplift pressures when empty. Encouraged by the e5 programme a novel solution was proposed. Deckdrain 700S/NW8 was proposed as an uplift pressure reliever and under slab drainage. Deckdrain has a filtration layer and is virtually impermeable. Deckdrain structure exceeds the drainage capacity of 500mm stone giving significant cost savings.

Read more

No featured products in this case study

Contact ABG creative geosynthetic engineering by clicking the button below to find out which products were used in this case study.

More case studies from ABG creative geosynthetic engineering

View all case studies from ABG creative geosynthetic engineering (31)