The A14 trunk road running between M1 Catthorpe Interchange and Felixstowe carries around 8500 vehicle a day. The project to upgrade the carriageway involved the construction of many large structures. These required drainage that could be quickly and safely installed. Traditional Methods requiring the use of manual handling equipment and site restrictions meant this method was problematic. Deckdrain 750S/ST170 and Deckdrain 1250S/ST170 were chosen to withstand passive earth movement. Deckdrain allowed for quick and easy installation reducing labour costs and vehicle movements on site.
Contact ABG creative geosynthetic engineering by clicking the button below to find out which products were used in this case study.