NBS Source
I'm a manufacturer

This case study is no longer available.

Streatham Hub

OVERVIEW

Streatham Hub is breathing new life into Streatham’s bustling high street. The mixed-used development comprises of 250 apartments, a 60,000 sqft retail Tesco store and 540 parking spaces. A total of 3,400m2 of Dryvit Outsulation Rail external wall insulation (EWI) system was installed. The Outsulation Rail insulated render system was fixed over SFS and cement particle board PMRB finish in a Sandpebble Fine texture was used in the colour China White.

No featured products in this case study

Contact Dryvit – a brand of Tremco CPG UK Ltd by clicking the button below to find out which products were used in this case study.