Stopsley High School

OVERVIEW

Stopsley High School, based in Luton, required further development to support its student capacity increase from 990 to 1,350. It resulted in the construction of a new school building, comprising 64 classrooms, a four-court sports hall, creative and music spaces and a special needs facility. In conjunction with contractors, Interserve and acoustic consultants, Arup, BriggsAmasco was selected to supply a total of four roofs to cover the building’s various aspects. The installation not only had to achieve a thermal performance of 0.15 W/m2K, it was required to meet the stringent acoustic performance requirements of BB93.

No featured products in this case study

Contact Briggs Amasco Ltd by clicking the button below to find out which products were used in this case study.