This version of the case study is no longer available. View latest
OVERVIEW
8,000m2 of limestone tiling was fixed using ARDEX X 7001 W
Tile Adhesive with Rapidry Formula Technology. The luxury tiles were grouted in just two hours, providing the perfect
finish to the £675m modernisation of the shopping centre.
ARDEX X 7001 Rapid Drying Floor Tile Adhesive
British Museum - London
Victoria and Albert Museum - London
North Manchester General Hospital
Burj Khalifa - Dubai
UltraTile works up an appetite at Slim Chickens
Houses of Parliament - London
Sydney Opera House - Australia
St.David's Shopping Centre - Cardiff