This massive project took two years of construction to complete, and Rondo’s technical services team were able to provide design solutions for challenging areas in the project. This included a heavy gauge 150mm Steel Stud Wall Framing System which required alignment with and concealment of the structural frame of the building, and a 6 metre high internal dividing wall that was subjected to higher internal pressures due to the louvres installed.
Contact Rondo Building Services Pty Ltd by clicking the button below to find out which products were used in this case study.
Mumbai Airport, India
Salalah International Airport, Oman
Doha International Airport, Qatar
Dubai International Airport - Concourse 4, Dubai