NBS Source
List your products

State Aquatic Centre, SA

by Rondo Building Services Pty Ltd

  Favourite

This massive project took two years of construction to complete, and Rondo’s technical services team were able to provide design solutions for challenging areas in the project. This included a heavy gauge 150mm Steel Stud Wall Framing System which required alignment with and concealment of the structural frame of the building, and a 6 metre high internal dividing wall that was subjected to higher internal pressures due to the louvres installed.

Read more

No featured products in this case study

Contact Rondo Building Services Pty Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Rondo Building Services Pty Ltd

View all case studies from Rondo Building Services Pty Ltd (140)