Spitbank Fort was originally built in 1878 and was part of a group of forts designed to defend the mouth of the Solent. This project created challenging circumstances for wood flooring because the structure is metal and is over 130 years old. Surrounded by sea creating high, fluctuating humidity and the structure was round so most of the boards had to be re-manufactured to fit. There were height restrictions because there were numerous arches creating low points and all the services had to be la…
Show moreContact The Solid Wood Flooring Company by clicking the button below to find out which products were used in this case study.
Walnut in the 2012 BBC Olympics Studio
White Lacquered Oak in Roman House, London
Percy & Founders Restaurant
Using Specialist Wood Finishing Products to create a Unique Wood Floor