NBS Source
I'm a manufacturer

This case study is no longer available.

Solid Fuel Open Fire Chimney Lining - Furanflex Case Studies

OVERVIEW

Initial Situation: The Lartington Hall owners wanted the existing marble fireplace to be made operational, so a large diameter flue liner was needed to maintain the cross sectional area. Project Challenge: Maintain the flue diameter within the chimney stack (use a thin liner). The flue tapered towards the top. Liner Chosen: FuranFLEX25 RWV Result: After the existing flue liner and chimney system had been removed cast, in situ pumped cement was used to form a gather to locate the bottom of the FuranFlex liner. A 300mm RWV liner was winched up through the existing chimney and it was hardened.

No featured products in this case study

Contact Kompozit'All UK by clicking the button below to find out which products were used in this case study.

More case studies from Kompozit'All UK

View all case studies (8)
Heritage Open Gas Fireplace

Heritage Open Gas Fireplace

Hospital Kitchen Extract Lining

Hospital Kitchen Extract Lining

School Heating Renovation

School Heating Renovation

Cathedral Ventilation Lining

Cathedral Ventilation Lining