NBS Source
I'm a manufacturer

This case study is no longer available.

Sir John Colfox School Stage and Curtain System

OVERVIEW

The Sir John Colfox School in Dorset worked with CPS to install a new stage and curtain system. CPS designed, manufactured and installed 20 Alu Rapid stage platforms for the school. The easy-running Alu Compact staging system was installed, which provides all of the main and side curtains with light hangers. The system can also be used to incorporate set decorations and studding partitions for the school's performances.

No featured products in this case study

Contact CPS Manufacturing Co LLP by clicking the button below to find out which products were used in this case study.