This project was to provide security measures to Severn Bridge for the NATO Summit. Small areas of the bridge needed securing in order to prevent dangerous, threatening packages being left. This was
highly important.
The clients were very pleased with the works carried out. And were impressed with what we supplied, such as the
Palisade fencing and palisade single leaf gates along with Pro-sure 358 fencing and heavy duty single leaf farm swing gate.
No featured products in this case study
Contact Procter Contracts by clicking the button below to find out which
products were used in this case study.