NBS Source
I'm a manufacturer

This case study is no longer available.

SE & U Duct Relining - FuranFlex Case Studies

OVERVIEW

Job type: SE & U Duct Project Length: 1 day Completed by: Kompozit’all UK Initial Situation: University College London’s Chemical duct from the chemical cabinet was leaking. The duct was located in a service riser with no access from the floors of the building. Project Challenge: To reline the duct without need to access ductwork through the building. Liner Chosen: FuranFlex 25 Black Result: The duct was successfully relined with FuranFlex Black. Access was only required at each end of the duct. The works were completed in 5 hours with minimal disruption to the building.

No featured products in this case study

Contact Kompozit'All UK by clicking the button below to find out which products were used in this case study.

More case studies from Kompozit'All UK

View all case studies (8)
Heritage Open Gas Fireplace

Heritage Open Gas Fireplace

Hospital Kitchen Extract Lining

Hospital Kitchen Extract Lining

School Heating Renovation

School Heating Renovation

Cathedral Ventilation Lining

Cathedral Ventilation Lining