NBS Source
List your products

Saffery Champness

by Billi UK

  Favourite

When Saffery Champness moved to the new premises in the City of London, they required boiling and chilled filtered water systems for their four tea points. Gail Woodend, Facilities Manager and Dean Donnelly, Facilities Assistant Manager were introduced to Billi after speaking to their appointed interior designer, Edge GB.After carefully discussing the client’s requirements, the Billi Quadra Plus 15 was specified for the four teapoints. This is extremely energy and space efficient as it combines filtered drinking water provision with hot water dispense, all from one under counter system.

Read more

No featured products in this case study

Contact Billi UK by clicking the button below to find out which products were used in this case study.

More case studies from Billi UK

View all case studies from Billi UK (20)