NBS Source
I'm a manufacturer

This case study is no longer available.

Rotherham Railway Station

OVERVIEW

For the £8.5m revamp of Rotherham Central Station, ICB supplied a comprehensive solar PV system for the stunning curved roof of the main entrance building. To achieve the targeted BREEAM accreditation of ‘very good’, the project sourced local materials, incorporated a rainwater harvesting system together with the ICB solar PV system and Evalon® V single ply membrane. The new Rotherham Central Station was officially opened by Transport Secretary Justine Greening in July 2012.

No featured products in this case study

Contact ICB (Waterproofing) Ltd by clicking the button below to find out which products were used in this case study.