WHEN WAS THE PROJECT? 2019 WHERE IS THE PROJECT? Riverstation Hotel Drammen WHAT WAS THE BRIEF? AND WHAT WAS DESIGNED AND INSTALLED? Glass walls with sliding 2 doors + glass portal serving hatch in kitchen area. – Exposed welds – Hot Rolled patina acid wash steel kicker plates – Exposed rivets – Reeded Glass WHO WAS THE ARCHITECT? www.haeg.no
Contact Metalform Group Ltd by clicking the button below to find out which products were used in this case study.
Olivia's Place
Oslo Loft
Muse House
Jan's Place