IKO worked with installing contractors BriggsAmasco to refine the roof specification and recommended IKO’s Mach One single layer bituminous membrane system, installed to the recommendations of wind uplift calculations and performing to a 0.18U value as per requirements.
No featured products in this case study
Contact IKO PLC by clicking the button below to find out which
products were used in this case study.