Replacing an Original 1949 Roofing Waterproofing System Including New Rooflights

OVERVIEW

Perry Hall Academy, a large primary school built in 1949, with original waterproofing still in-situ. IKO assisted the Academy funding bid by providing a detailed survey report, including intrusive core sample analysis. The roofs were suffering from water ingress, cracks in the mastic asphalt, pooled water and poor heat retention, so decision was made to replace the roofs throughout. New rooflights were also specified to allow more natural light in while the design chosen reduced the external noise transmission. IKO worked with specifier Concept Education Services to deliver the project (some work during term-time) within 6 months.