NBS Source
I'm a manufacturer

Repairing School Roofs That Were Beyond Serviceable

OVERVIEW

Three flat roofs that were beyond serviceable have had their roof surface and insulation refurbished with a tapered scheme in order to eliminate water pooling which was a consistent problem.

No featured products in this case study

Contact IKO PLC by clicking the button below to find out which products were used in this case study.

More case studies from IKO PLC

View all case studies (88)
Essential Roofing Works Carried Out For Sewage Treatment Works

Essential Roofing Works Carried Out For Sewage Treatment Works

1,000m2 Ecological, Air Purifying Roofing Refurbishment for a Library

1,000m2 Ecological, Air Purifying Roofing Refurbishment for a Library

Manhole Reinstatement - IKO Pacopatch, Market Harborough

Manhole Reinstatement - IKO Pacopatch, Market Harborough

IKO Polimar CRS used for Trimpley Water Treatment

IKO Polimar CRS used for Trimpley Water Treatment