At Speedwell Mill the existing damp concrete floor was dug up and excavated ready to install the breathable LABC registered Glasscrete (Limecrete) floor system. This was to prevent the old concrete floor from driving ground moisture to the perimeter walls causing damp issues.
Contact GEOCELL Foam Glass by clicking the button below to find out which products were used in this case study.
Renovation - Glasscrete Floor
New Build - Sub-base