The award winning Pure Gym brand required a waterproofing solution for the shower cubicles in their new Southampton gymnasium. The shower blocks needed to be fully waterproofed and appropriate drainage systems installed, capable of coping with continuous flow rates of 24 L/min.
Modular Wet-Floor Systems were specified for the timber floors and floor formers were butted together and installed side by side, creating individual falls towards the contemporary linear drains. In addition, floor formers were installed alongside the cubicles resulting in the whole shower area being laid to fall.
No featured products in this case study
Contact CCL Building Products Ltd by clicking the button below to find out which
products were used in this case study.