NBS Source
I'm a manufacturer

This case study is no longer available.

Promat SYSTEMGLAS® passes 30-year UK milestone

OVERVIEW

This year marks the 30th anniversary of the first UK installations of SYSTEMGLAS®, the complete fire rated glazing system from Promat UK, and demand is stronger than ever. The 30-year milestone is proving to be an important factor behind the increasing interest in SYSTEMGLAS® from architects, specifiers, interior designers, clients and contractors who are seeking assured passive fire protection in their glazing, partitioning and building interiors. The market-leading system, which is supported by Promat UK’s ‘360° Wheel of Assurance’ encompassing full control and traceability through design, manufacture, installation and completion inspection.

No featured products in this case study

Contact Promat UK by clicking the button below to find out which products were used in this case study.

More case studies from Promat UK

View all case studies (19)
Manchester Airport Case Study - PROMAT DURASTEEL to create 60-minute fire-rated ceiling

Manchester Airport Case Study - PROMAT DURASTEEL to create 60-minute fire-rated ceiling

Stronelairg Wind Farm Case Study - Promat, Duratseel

Stronelairg Wind Farm Case Study - Promat, Duratseel

First Way Campus Student Accommodation, Wembley Park Case Study - Promat

First Way Campus Student Accommodation, Wembley Park Case Study - Promat

The role of vacuum insulated panels (VIP) in FHS’s ‘world-leading energy efficiency’ goal

The role of vacuum insulated panels (VIP) in FHS’s ‘world-leading energy efficiency’ goal