The £230m Princesshay Shopping Centre, in Exeter, officially opened to the public in September 2007, as part of the city’s biggest ever regeneration project, with over 70 shops, cafés and restaurants. The roof of the centre, installed when the building was constructed, had caused various problems throughout its life. A Sarnabar system in Lead Grey was chosen, with a T fleece between the composite deck and the mechanically fastened Sarnafil S327-18EL membrane. On a smaller roof with a plywood de…
Show moreContact Sika Sarnafil by clicking the button below to find out which products were used in this case study.
Leeds Arena
Norwich Castle
Center Parcs, Longleat
Ewart Grove, London