As part of the £200m New Waverly development of Edinburgh’s historic old town, a new Premier Inn was commissioned. Overlooking the characterful Royal Mile, the exterior facade of the new building had to seamlessly integrate old with new.
The design of the building takes a traditional sandstone material and combines with glass and aluminum to form a stunning, contemporary finish. The striking colouration of Stanton Moor sandstone features a buff base with brown and gold variation, matching closely with the materials used in the historic city.
Carboniferous sandstone from Stanton Moor quarry. A buff sandstone with technical properties....
No featured products in this case study
Contact Marshalls plc by clicking the button below to find out which
products were used in this case study.