OVERVIEW
Early on in the design of this Social Housing scheme at Stump Cross, Pontefract, it was decided that only a permeable pavement would work as the SuDS solution for this development. As the existing drainage infrastructure in the area was already working close to its capacity any additional run off from this developments could cause surface water flooding. Swales and ponds were not be feasible as there was insufficient space available for them. A permeable pavement was therefore chosen as there was no additional land take involved. To view the whole case study please click the link below.
Contact Brett Landscaping by clicking the button below to find out which products were used in this case study.
Wales Millennium Centre
Porcelain Roof Terraces, Greenford Quay, London
Trief Containment Kerbs provide the solution for the renovation of the central reservation on a major duel carriageway in Cheshire.
Trief Cadet Containment Kerbs provides protection to a Victorian road bridge in North Wales.