NBS Source
I'm a manufacturer

This case study is no longer available.

Oasis Leisure Centre

OVERVIEW

Working in partnership with GLL, Oasis Leisure Centre reduced their annual water and energy consumption through installing Kelda showers by £10,000 per year, at current costs.

No featured products in this case study

Contact Kelda Showers by clicking the button below to find out which products were used in this case study.

More case studies from Shower fittings package

View all case studies (4)
The secluded space

The secluded space

A heritage bathroom

A heritage bathroom

Addington School 6th form block in Woodley

Addington School 6th form block in Woodley

Revolutionising healthcare water hygiene: proven, effective, and sustainable

Revolutionising healthcare water hygiene: proven, effective, and sustainable