NBS Source
I'm a manufacturer

This case study is no longer available.

Newton Waterproofs the London School of Economics

OVERVIEW

Principal Contractor, Mace Group, appointed Newton Specialist Contractor Cast Contracting Ltd (CCL) to design and install the waterproofing to the Marshall Building of the London School of Economics. CCL recommended the Type C Newton CDM System as it is the safest and most reliable form of waterproofing. CCL prepared the extensive two-storey basement with Newton 906 Lime Inhibtor and Newton 103-S before installing over 2,250m2 of Newton 520 eco membrane to the floor and over 570m2 of Newton 508 membrane to create the Newton CDM System.

No featured products in this case study

Contact Newton Waterproofing Systems by clicking the button below to find out which products were used in this case study.

More case studies from Newton Waterproofing Systems

View all case studies (40)
Waterproofing a Luxury London Hotel

Waterproofing a Luxury London Hotel

Warwick Court Redevelopment, London

Warwick Court Redevelopment, London

Flooded Shop Basement Refurbishment, Chelsea

Flooded Shop Basement Refurbishment, Chelsea

Saving a Notting Hill Failed Double Basement

Saving a Notting Hill Failed Double Basement