by CDI Innovative Construction Materials Ltd

  Favourite

This new-build house was in a remote location and off-grid for mains gas, the house was to be heated by a heat pump and so efficiency was a major consideration for the project. The Lewis Deck system was chosen for the 1st floor of the building to provide the same efficiencies for the underfloor heating as the concrete ground floor as well as providing a high level of acoustic separation for this quality timber frame project. The build-up included the Lewis flanking and resilient strips, Lewis Deck, Anhydrite liquid screed and underfloor heating pipes.

Read more

No featured products in this case study

Contact CDI Innovative Construction Materials Ltd by clicking the button below to find out which products were used in this case study.