NBS Source
I'm a manufacturer

This case study is no longer available.

New EEZI-FIT multi-waste manifold installed on project in mayfair

OVERVIEW

The new EEZI-FIT manifold was installed on a project in Mayfair. The product was selected due to the capability of low level waste connection. Being fire resistant the cast iron manifold requires no fire protection and requires only a 200mm core hole.

No featured products in this case study

Contact Saint-Gobain PAM UK by clicking the button below to find out which products were used in this case study.